3 Marla House Construction Cost
The cost of constructing a building on 3 Marla is low. You must invest a lot of money to build a structure on 3 Marla. Costs can be influenced by the location of a project and the materials used. The quality of steel, cement, and bricks is also essential. As a result, we have provided three types of investments: Economic, Standard, and Premium. In the table below, you will find all the information you need.
Construction costs can also be affected by the design of the building. The price of complex and intricate designs is high, while the cost of straightforward techniques is low. Furthermore, building a house is a complex process that requires professional help and expertise. Hiring a professional contractor or engineer can ensure the construction process runs smoothly and the outcome meets your expectations.
Covered Area of a 3 Marla House
3 marla is a unit of land area. It is used for its measurement and is used mainly in South Asia countries like Pakistan and India. 3 marla will cover approximately 816.524 square feet and 69.523 square meters.Â
An area enclosed by walls and roofs of a building is generally referred to as a built area or a covered area. Hence, it is imperative when it comes to construction. In a building, the amount of space covered by the roof, the number of floors, and the number of rooms are determined by its design.
The Cost of 3 Marla Grey Structures in 2024
The most important and foremost step for construction is its gray structure. A gray system consists of the construction of the foundation, the building of the walls, the installation of plumbing, electrical wiring, and connections, the leveling of the floor, and the plastering of the walls. A gray structure equals the cost of bricks, cement, division, and electrical wiring.
Bricks have been the best material for construction since ancient times. Because bricks provide a level of support and are long-lasting. However, almost 20000 to 30000 bricks are required for construction.
3 Marla House Construction Material
Several factors will affect the construction materials for a 3-marla house, including the location, the budget, and the owner’s preferences. The construction of a home generally consists of three materials, each of which has its own advantages and disadvantages.
For the construction of 3 Marla houses, the following materials are required.
Buying Bricks
In Pakistan, bricks are a standard construction material for homes, including eight marla houses. Generally, bricks in Pakistan measure 9*4.5*3 inches. The cost of bricks for 3-marla house construction in Pakistan would depend on various factors such as the site construction’s location, the bricks’ quality, and market rates. On average, bricks can range from Rs.10 to Rs.12 per brick. Amusse that a 3-marla house would require approximately 10,000 bricks, the estimated cost is 100,000 to 180,000.
Ravi, Chenab Sand Cost
Sand is also an essential material for constructing a three-marla house as it is an essential component of its construction. The type of sand that is used in Pakistan is known as Ravi sand, while another kind of sand is known as Chenab sand. Ravi rate sand costs Rs.42 per cubic foot, while Chenab rate sand costs Rs.50 per cubic inch. The Ravi sand cost is Rs.30,000 to 40,000, and the Chenab sand cost is Rs.20,000 to 30,000.
Read Also : 5 Marla House Construction Cost
Cost of Crushing and Rori
The use of crushes in construction is widespread. Margala and Sargodha crush are the two types of crushed stone used in construction. Margala Crush has a price of Rs.138 per CFT, and the cost of the other product has a price of Rs.130 per CFT. The crush price for Margala is between Rs 55,000 and Rs 65,000, while the crushing price for Sargodha is between Rs 40,000 and Rs 60,000.
In the construction of a house, cement is used as a binding material. The amount of cement bags you need to construct a three-marla house is almost 400. There is a charge of Rs.480,200 for the cost of cement for a 3-marla construction.
Material Costs for Steel and Plumbing
Houses are built with steel, which is undoubtedly a very important building material. There are 1 tons (1000 kg) of steel needed to construct an 3-marla house. The current price of steel in Pakistan is Rs.320 per kilogram. However, the total steel cost is 380,000.
Electric Wiring Material
A house’s electrical wiring is also one of the most important materials in its construction. According to the estimations, the cost of wiring construction for the 3-marla house will be around 5,086,90. This category includes the cost of conduit and accessories, switches and back boxes, wires and cables, lights and fans, as well as labor costs.
Grills for Safety
Safety grills are available for windows and main gates and are made of steel, they are also available in different designs in the market. There is a budget of almost 50,000 PKR that you have set aside for the construction of the 3-marla house, which is to be built in Pakistan, for the purpose of purchasing safety grills.
Steel Choughat Cost
Construction of house steel Choughat is more valuable for completing the house. The doors and windows are then fixed in this frame, these frames or Choughat are made of durable steel sheet, and the total price for the construction of 3 marla houses is PKR 90,000 to 150,000.
Flooring Tiles Cost
The flooring tiles are essential when the house is finished. In terms of flooring tiles, there are a variety of quality, price, and design options available, such as 90 tiles for flooring, 600 tiles for bathrooms, 55 tiles for garages, etc.Â
Decorative Paint for Walls and Ceilings
- A gallon of good quality paint costs between Rs. 2000 and Rs. 4000, depending on the brand.
- A 3-marla house will require 10 to 15 gallons of paint, depending on the number of rooms.
- The price of paint can range from 50,000 to 100,000 rupees.
- The cost of false ceilings and plaster of Paris (POP) ceilings varies depending on the design.
- The cost of installing false ceilings, including labor and materials, can range between Rs. 120 and Rs. 150 per square foot.
- A POP ceiling has a cost per square foot that can range anywhere between Rs. 200 and Rs. 250, depending on the material and labor used.
- False ceilings can cost anywhere from Rs. 1,080,00 to Rs. 1,350,00 to install in a 3-marla house with an average ceiling height of 9 feet, based on the size of the house.
- Normally, the cost of installing a POP ceiling in a 3-marla house with a 9-foot ceiling height is between Rs. 1,80,000 and Rs. 2,25,000.
Wooden work and Main Gate Cost
The wooden work and main gate of a 3-marla house can vary widely in price, based on factors like materials, design, and size. For a 3-marla house in Pakistan, wooden work and the main gate can cost between PKR 150,000 and PKR 300,000.
Kitchen and Bathroom Accessories
- Cabinets and countertops will cost between 200,000 and 400,000
- The price of sinks and faucets can range from Rs. 20,000 to Rs. 50,000, depending on the type of material used.
- The cost of buying appliances (e.g. stove, refrigerator, etc.) varies between Rs. 100,000 and Rs. 200,000.
- 50,000 to 100,000 rupees for electrical and lighting work
- Approximately Rs. 370,000 to Rs. 750,000 is the total cost of the project
- Toilets and sinks will cost between Rs. 40,000 and Rs. 100,000 for each bathroom, depending on the size of the room
- Each bathroom includes a shower, faucet, and sink that costs between Rs. 20,000 and Rs. 30,000
- Flooring and tiles: Rs. 50,000 – Rs. 100,000 per bathroom
- Per bathroom, lighting and electrical costs range from Rs. 20,000 to Rs. 40,000
- Total Cost (2 Bathrooms): Rs. 220,000 – Rs. 480,000
Electric EquipmentÂ
- Fans can expect to receive 2,500-10,000 rupees
- There is a price difference between Rs. 100 and Rs. 1,000 for lights and bulbs
- The price of outlets and switches varies from 50 to 300 rupees
- It costs between 1,000 and 5,000 rupees per circuit breaker
- 1000 to 5000 rupees for cables and wires     Â
- There is a range of prices for UPSs, depending on their brand and capacity.
- Depending on brand and capacity, generators cost between Rs. 50,000 and Rs. 100,000
- Solar panels range in price from Rs. 10,000 to Rs. 100,000, depending on their brand and capacity.
Railings on Stairs
Depending on the material used, the cost of stair railing in Pakistan can range from PKR 500 to PKR 1,500 per running foot. A simple iron railing may cost about PKR 500 to PKR 700 per running foot, while a more elaborate wrought iron railing can cost approximately PKR 1,000 to PKR 1,500 per running foot, depending on its complexity.
Decorative Mirrors, Windows, and Doors
Mirrors, windows, and doors used to build a three-marla house in Pakistan cost a considerable amount depending on a number of factors, such as the quality of the materials used, the style and design of the products, and the amount of labor that is involved in the construction process.
It is estimated that the cost of mirrors, windows, and doors for a 3-marla house in Pakistan can range anywhere from PKR 200,000 to PKR 300,000 or more, depending on the factors mentioned above.